Tags: ‘работа на мкс’
Work on ISS. Ecosphere (MO-21) Checking (photo)
Ecosphere’s Equipment (MO-21) Checking.
Dust on the ISS (photo)
Dust Collectors on the ISS Dust Filters Replacement
Preparation for the Landing (photo)
On the background of the Earth and Soyuz Selfie with Steve and Robonaut going home soon…
Work on ISS. EDV (water tank) replacement (photo)
EDV (water tank) replacement for the oxygen regeneration system “Electron”.
One more Fit Check in Kazbek couch (Soyuz 712) (photo)
Fit Check in Kazbek couch (Soyuz 712). It is carried out in 60 days of flight and in three weeks prior to landing.
Work after Spacewalk (photo)
The Portable Portable Pressurization Unit dismantling from the Service Module.
Spacewalk (EVA-39), 18, 2014 (photo)
EVA-39 Spacewalk. Lock-Chamber Hatch opening, August 18, 2014 EVA-39 Spacewalk. Nanosatellite deployments, August 18, 2014 I’m Waiting for Sasha. Steve making our photos from the MIM we’re working at night… Left – Joining of Sockets. Right – We have a rest Alexander Skvortsov. The blue Ocean. Left – Safety Carbines. Right – Installation of the […]
Russian Spacewalk (EVA-39). August 18, 2014 (photo)
Nanosatellite deployments
Russian Spacewalk (EVA-39). August 18, 2014 (photo)
Lock-Chamber Hatch opening
The Main Objectives of the Russian Crew Spacewalk (EVA-39) on August 18, 2014
EVA-39 Cyclogram (rus) About the Objectives EVA-39 see www.spaceflight101.com
Spacewalk Preparation (EVA-39) (photo)
Package Preparation for Container Isolation of “Biorisk” Experiment.
Spacewalk Preparation (EVA-39) (photo)
Nanosatellite’s Battery Charger Repair
Work on the ISS. TBU-V Thermostat Installation (photo)
TBU-V Thermostat Installation for the KASKAD Experiment.
Work on ISS. Glass Windows Inspection and Photography. MIM2 Module (photo)
Work on ISS. Cleaning of removable Lattices GJT (Gas-liquid heat exchanger) in FGB (Functional Cargo Block) (photo)
Work on ISS. Preparation for ATV5 Cargo Reception (photo)
Inventory of Air Ducts for ATV5 Cargo reception.
Work on ISS. Ecosphere (MO-21) Checking (photo)
Verification Scheme Assembling. Ecosphere’s Equipment (MO-21) Checking. MO-21 determines microbial contamination of the ISS atmosphere, specifically the total bacterial and fungal microflora counts and microflora composition according to morphologic criteria of microorganism colonies. The equipment, consisting of an air sampler set, a charger and power supply unit, provides samples to help determine microbial contamination of […]
After EVA-38 (photo)
Packing tool for storage. Removing spacesuit’s replaceable elements.
TikTok: tiktok.com/@olegmks
ВКонтакте: vk.com/olegmks
YouTube: youtube.com/c/OlegMKS
Яндекс.Дзен: zen.yandex.ru/olegmks
RuTube: rutube.ru/channel/23320330/